Structural engineer’s report in Scotland
9 providers offering structural engineer’s report in or across Scotland, including national firms. The rules in Scotland differ from England’s, so see the notes below.
Structural calculations support the building warrant application rather than a building control submission, but the engineering principles are the same.
9 structural engineers for Scotland
Featured (paid) listings first, then A–Z · How we check listings
Showing all 9 providers
Based in or covering Scotland (3)
G O McNair Chartered Engineers
Based in Milngavie, Glasgow · Covers Glasgow and the West of Scotland Accreditation not yet checkedNarro Associates
Based in Edinburgh · Covers Offices in Edinburgh, Glasgow, Stirling, Inverness, Aberdeen and Newcastle; UK-wide Accreditation stated by provider: ACE, Constructionline, ISO 9001, ISO 14001National providers (check they cover your area) (6)
Allcott Associates
Based in Leamington Spa, Warwickshire · Covers England and Wales (12 offices) Accreditation stated by provider: RICS, IStructE/ICEAlpine Property Surveys
Based in Multiple UK offices (incl. Birmingham) · Covers West Midlands and nationwide Accreditation stated by provider: Not statedIntegrated Designs & Associates
Based in Great Barr, Birmingham · Covers West Midlands and UK-wide Accreditation stated by provider: Not statedJMS Engineers
Based in Ipswich and Norwich · Covers East Anglia, Cambridge, Norfolk, Suffolk, Essex, Peterborough and London; UK-wide delivery Accreditation not yet checkedRWA Consulting
Based in Wendover, Buckinghamshire · Covers Buckinghamshire and clients throughout the UK Accreditation not yet checkedStructural Surveys Ltd
Based in Daresbury, Warrington · Covers The whole of England plus parts of Scotland and Wales Accreditation not yet checkedLondon (10) South East (3) South West (6) West Midlands (7) East Midlands (8) Yorkshire and the Humber (9) North West (10) North East (4) Wales (3) Northern Ireland (4)
Getting signed off in Scotland
In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.