02 · Building Regulations · Part F

Ventilation commissioning

If a new home has mechanical ventilation, such as extract fans, continuous extract or MVHR, the air flow rates must be tested and the results given to building control. The same applies when mechanical ventilation is installed in an existing home as part of notifiable work.

DWGuide by Dan Wallis · Updated 27 September 2026

This guide covers the rules in England. See Wales, Scotland and Northern Ireland.

61 ventilation testersPart F
Who needs oneAnyone building a new home with extract fans or whole-house ventilation, and some work on existing homes
Who can do itA competent ventilation tester, often BPEC qualified
WhenAt completion; results to building control within 5 days of the final test

61 ventilation testers listed across the UK

Featured (paid) listings first, then A–Z · How we check listings

National providers (29)

Regional providers (check they cover your area) (1)

What gets tested

  • Extract rates from kitchens, bathrooms and utility rooms
  • Supply and extract rates for whole-house systems such as MVHR
  • That controls, boost settings and filters are set up correctly

Deadlines and paperwork

The person carrying out the work must make sure the air flow rates are tested using the approved procedure, and give the results to building control no later than five days after the final test. The homeowner should also be given information on how to use and maintain the system.

In Wales, Scotland and Northern Ireland

This guide describes the rules in England. Building regulations are devolved, so here is how ventilation commissioning works in the rest of the UK.

Wales

The same as England: mechanical ventilation air flows are tested, and the results go to building control within 5 days of the final test. This also covers notifiable ventilation work in existing homes.

Scotland

Mechanical ventilation must be commissioned, with air flows measured at each fan or vent and recorded on a commissioning sheet. There is no national 5-day deadline, but building standards will want the evidence with the completion certificate.

Northern Ireland

Under Technical Booklet K, mechanical ventilation is commissioned and air flows are tested where practicable. The results go to the council within 5 days.

Common questions

Do trickle vents need testing?

No. Testing applies to mechanical ventilation. Trickle vents and other background ventilation are checked as part of the design.

Can my electrician do it?

Possibly, if they are competent to test and commission ventilation systems. Many firms use testers with a BPEC domestic ventilation qualification.

What gets tested?

Extract rates from kitchens, bathrooms and utility rooms, supply and extract rates for whole-house systems such as MVHR, and that controls, boost settings and filters are set up correctly.

When do the results go to building control?

No later than five days after the final test. The homeowner should also be given information on how to use and maintain the system.

New to the jargon? See our glossary of terms, from air permeability to TrustMark.