01 · Planning stage · Ecology

Bat survey

Bats and their roosts are protected by law, so if your project could affect a building or trees bats might use, your council will usually ask for a bat survey before granting planning permission, or attach it as a condition.

DWGuide by Dan Wallis · Updated 4 October 2026

This guide covers the rules in England. See Wales, Scotland and Northern Ireland.

16 ecologistsEcology
Who needs oneAnyone converting a loft, barn or older building, re-covering a roof, or removing trees or hedgerows near a possible roost
Who can do itAn ecologist with the relevant bat survey licence
WhenBefore you submit; emergence surveys usually only run May–September

16 ecologists listed across the UK

Featured (paid) listings first, then A–Z · How we check listings

Find ecologists by region

North West (4) Scotland (3)

National providers (9)

Bowland Ecology Ltd

Based in Clitheroe, Lancashire · Covers North West England, Scotland (Glasgow office) and UK-wide Accreditation stated by provider: CIEEM Registered Practice, ISO 9001, ISO 14001, CHAS
Own websiteUK-wide
Request quote View profile

Brooks Ecological Ltd

Based in Guiseley, Leeds · Covers Yorkshire and the Humber, North West England, nationwide Accreditation stated by provider: CIEEM Registered Practice (2025-2026), follows BS 42020
Own websiteUK-wide
Request quote View profile

Regional providers (check they cover your area) (5)

PJC Consultancy Ltd

Based in Ashford, Kent · Covers South East England (Kent, East Sussex, West Sussex, Surrey) Accreditation stated by provider: Arboricultural Association, Chartered Institute of Chartered Foresters, CIEEM Registered Practice
Own website
Request quote View profile

When a survey is likely to be asked for

  • Converting a loft, barn or outbuilding with gaps in the roof or soffits
  • Demolishing or substantially altering a building built before the 1990s
  • Removing mature trees or hedgerows that could support a roost
  • A site near woodland, water or other bat habitat flagged on the council’s ecology checklist

How the survey process works

Most projects start with a preliminary roost assessment: a daytime inspection for droppings, staining and gaps a bat could use. If that finds potential roost features, further emergence or re-entry surveys are needed, usually between May and September, which can add several months to your timeline.

Build the survey season into your programme early. A loft conversion submitted in winter can stall until the following summer if a roost is suspected and the right season has passed.

In Wales, Scotland and Northern Ireland

This guide describes the rules in England. Building regulations are devolved, so here is how bat survey works in the rest of the UK.

Wales

The same core legal protections apply, enforced by Natural Resources Wales. Councils in Wales use similar ecology checklists to flag sites needing a survey.

Scotland

Bats are protected under the same UK-wide legislation, enforced by NatureScot. Surveys follow the same seasonal pattern as the rest of the UK.

Northern Ireland

Bats are protected under the Wildlife (Northern Ireland) Order, enforced by NIEA. The survey approach and seasonal timing are the same.

Common questions

Do I need a bat survey for every loft conversion?

No, only where the roof has gaps or features a bat could use, or the council’s validation checklist flags the site. Many straightforward conversions on newer roofs don’t need one.

What if bats are found?

The ecologist designs a mitigation scheme, which may need a licence from Natural England before work starts. Work usually can’t begin until that’s in place.

How long does it take?

A preliminary assessment can be quick, but if emergence surveys are needed they only run in the May–September season, so a winter application can face a long wait.

Who can do the survey?

An ecologist holding the appropriate bat survey licence. Preliminary assessments don’t always need a licence, but any handling or further survey work does.

New to the jargon? See our glossary of terms, from air permeability to TrustMark.